Municipal
Water treatment plant at the gas station
Pustiměř, Jihomoravský kraj
- Elaboration of project documentation in three levels for territorial proceedings, building permits and construction realization, including report on area measurements and itemized budget for contractor selection.
- Engineering activity for a purpose of issuing a territorial decision and building permit.
- Construction and machine-technology modifications of the existing pumping station and borehole in order to supply municipalities Radslavice, Pustiměř and Ivanovice with drinking water.
- Project for a new wastewater storage tank and sewer connection.
- Project for an extension of electrical wiring, measurement and regulation (MaR) and automatic / automated process control system (ASŘTP).
Improvement of the microbiological image in the pumping station
Loučky, Liberecký kraj
- Construction of a one-stage project documentation for the building permit and realization of construction, including report on area measurements and itemized budget for contractor selection.
- Technological and partly building modifications of the existing pumping station for the supply of drinking water.
- Hygienic safety and improvement of organoleptic properties of water (odour).
Drinking water treatment plant
Hrušovany nad Jevišovkou, Jihomoravský kraj
- Extension and reconstruction of the existing water treatment plant, new accumulation tanks of 15 m3,
- Water treatment technology from boreholes, PVC piping, pumping technology.
- Electrical wiring, technological process control systems (SŘTP).
- Delivery of 12 pieces of open filters with interstitial space (air and water wash).
Reconstruction of water tank - 1st stage of construction
Benešov u Semil, Liberecký kraj
- Reconstruction of two side-by-side water tanks - Old (50 m3) and New (2x100 m3) water tanks.
- Dismantling of existing equipment, earthworks and demolition work, drainage, sewage pipelines.
- New monolithic supporting structures, rehabilitation of storage chambers, waterproofing, insulation, installation of stainless steel fittings, ventilation.
- Making the Klinker facade masonry at the new water tank.
- Electrical wiring, measurement and regulation (MaR), installation of data transmission equipment for dispatching and their recovery.
New wastewater treatment plant - water supply
Modrava, Plzeňský kraj
- Drilling equipment, borehole water treatment technology, stainless steel piping, pumping equipment.
- Electrical wiring, measurement and regulation (MaR).
- Supply of open stainless steel filter with drainage system with horizontal cover sheet and air and water wash.
Renewel of pumping station in Radotínská Street including water treatment plant and water resources renewal (wells C1-C4 and wells next to the gas station) after the floods in 2013
Černošice, Středočeský kraj
- Reconstruction of the water tank during operation, revitalization of 3 boreholes, installation of a storage tank for water of 20 m3.
- Earthworks including PE water connection, dismantling of existing technology, supply and installation of new technology for water treatment from wells.
- Electrical wiring, measurement and regulation (MaR).
- Delivery of 3 pieces of automatic pressure stainless steel filters with a diameter of 1 600 mm, a horizontal aerator with a storage capacity of 6 m3, pumping equipment, fittings, stainless steel and PE piping.
Reconstruction of water treatment plant
Borek, Hrudka, Liberecký kraj
- Dismantling of existing technology, construction work.
- Supply and installation of new water treatment technology from spring.
- Electrical wiring, measuring and regulation (MaR), data transmission equipment for dispatching.
- Pre-chlorination, sorption: Supply of 2 pressurized TVK 100 UM stainless steel filters with granular activated carbon with a diameter of 1,000 mm, aeration: PVS 661 stainless steel aeration tower and chlorination to accumulated treated water.
- Delivery of pumping equipment, fittings and stainless steel piping.
Water treatment plant in the village
Debrné, Královehradecký kraj
- Reconstruction of the water treatment plant, disassembly of existing technology, construction works, supply and installation of new technology for water treatment from a surface source to drinking water.
- Electrical wiring, measurement and regulation (MaR) including visualization and data transmission.
- Delivery of two-stage filtration through pressurized stainless steel filters with a diameter of 1,400 mm, pumping technology, fittings and pipelines made of PVC and stainless steel.
Expansion of water tank and strengthening of water resources in the village Rozšíření vodojemu a posílení vodních zdrojů v obci
Žernovník, Jihomoravský kraj
- Work on new water tank, the existing pumping station and well.
- Installation of new technology for water treatment from boreholes (2 open fast filters - sand and manganese).
- Supply and installation of boreholes, accumulation tanks, stainless steel piping, fittings, pumping equipment.
- Electrical wiring, measurement and regulation (MaR).
Installation of a new stripping column (water tank V Polích) and reconstruction of a stripping column (old water tank)
Červený Kostelec, Královéhradecký kraj
- Delivery and assembly of two stripping columns (stainless steel aeration towers),
disassembly of existing stripping columns, construction works.
- Electrical wiring and measurement and regulation (MaR), pipework, fittings and soundproofing.